1 / 5
Jracking Heavy Duty Warehouse Racks Shelves RMI Certified Steel Teardrop Pallet Racking for Cold Storage Warehouse
Product Description
Pallet Racking Solutions
Pallet racking is the most popular functional racking in the industry. As the most commonly used warehousing system for storing palletized products, it can store all kinds of goods.
The pallet racking produced by Jracking (China) Storage Solutions is widely used in e-commerce warehouses, factory workshops, and logistics centers.
When used in conjunction with various types of pallets, material boxes, and forklifts, it greatly enhances the utilization rate of warehouse space and optimizes the operational convenience of storage equipment.
Technical Specifications
| Name | Teardrop (US) Pallet Rack | Material | Steel |
| Depth | Upright 1.5; 2.0; 2.5mm | Weight Capacity | 1000-1500 Kg Per Pallet |
| Width | Customized | Height | Customized |
| Frame Structure Type | 3"*3" Welded & Bolted Upright frame with Baseplate | ||
| Beam Type | 3"-6" Step Beam | ||
| Beam Connector Type | SP & SL Safety Locker | ||
| Surface Finish | Powder coating; Galvanized; Hot Dip Galvanized | ||
| Application Environment | Normal Temperature or Cold Room (Max -40°C) | ||
| Certification | CE / ISO9001 / AS4084 / RMI | ||
| Free Sample | Available (Delivery Cost on Buyer) | ||
| OEM | Available | ||
Product Details & Components
Frequently Asked Questions (FAQ)
Q1
What are your trading terms and payment options?
1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C and O/A are also available.
2) Lead time: Normally 20-25 days after deposit received.
3) Sample policy: Samples are available for each model (ready in 7-15 days).
4) Shipping port: Shanghai / Nanjing, China.
5) Discounts: We offer attractive discounts for large volume orders.
2) Lead time: Normally 20-25 days after deposit received.
3) Sample policy: Samples are available for each model (ready in 7-15 days).
4) Shipping port: Shanghai / Nanjing, China.
5) Discounts: We offer attractive discounts for large volume orders.
Q2
How can I deliver my goods?
1) Sea freight: We will update sea freight costs once your destination sea port is provided.
2) Client-designated agent: Simply provide the contact details of your shipping agent, and we will coordinate delivery with them directly.
2) Client-designated agent: Simply provide the contact details of your shipping agent, and we will coordinate delivery with them directly.
Q3
What services does Jracking provide?
1) Inquiries related to our products or prices will be replied within 12 hours.
2) Well-trained and experienced staff to answer all your inquiries in fluent English.
3) Full OEM & ODM capabilities for customized racking design.
4) Experienced professional engineers to deliver optimal warehouse storage solutions.
2) Well-trained and experienced staff to answer all your inquiries in fluent English.
3) Full OEM & ODM capabilities for customized racking design.
4) Experienced professional engineers to deliver optimal warehouse storage solutions.
Q4
What is the purchasing process?
Design drawing → Confirm drawing → Quotation → PI → Confirm PI → Arrange 30% deposit → Manufacture → QC inspection → Pay balance → Shipping.
Q5
What are your key advantages?
1) Flexible Payment: Support O/A terms (40-60 days).
2) Fast Lead Time: Fast delivery capability for rush orders.
3) Factory Direct Price: Competitive direct manufacturer pricing.
4) Warranty: Two years warranty with free replacement parts shipped to you if broken.
2) Fast Lead Time: Fast delivery capability for rush orders.
3) Factory Direct Price: Competitive direct manufacturer pricing.
4) Warranty: Two years warranty with free replacement parts shipped to you if broken.
Q6
Does Jracking have an MOQ limitation or mold fee requirement?
1) MOQ: No strict MOQ limit, but we recommend ordering to fit at least one 20ft container (approx. 15 tons) for optimal pricing.
2) Tooling Fee: For custom mold requirements, tooling costs are charged upfront and will be partially or fully refunded based on order quantities.
2) Tooling Fee: For custom mold requirements, tooling costs are charged upfront and will be partially or fully refunded based on order quantities.









